Close

LAMBUYUGAN BRIDGE

Subcontract awarded to ECSCI by OGS Construction.

The Tyfo® Fibrwrap® systems was applied in Lambayugan Bridge to  increase the strength of existing beams, slabs, columns and structural connections of the bridge.
  • TYFO SCH41 Carbon Fiber

  • Epoxy Mortar

  • Crack repair using epoxy injection

  • Increase load ratings

  • Maintain the appearance and overall aesthetics of historic bridges

  • Extend the service life

  • Construction error remediation

Warning : Content Page is Protected!!!