Close

CONG DADONG DAM PHASE 2

The Local Govement Unit (LGU) Arayat, awarded the contract to EC Structural Composite, Inc. to retrofit the Cong Dadong Dam Phase 2

 

The Tyfo® Fibrwrap® systems was applied in Cong Dadong Dam Phase 2 to protect the structural elements, regain its original strength and increase the original capacity.
  • Tyfo SCH 41
  • Tyfo S
  • Tyfo SW
  • Epoxy Injection
  • Underwater Putty
  • Rehabilitating corroded or distressed members
  • Performing seismic repairs of structural components
  • Control the corrosion and protect the elements from aggressive environment
  • Extend the service life of coastal

Warning : Content Page is Protected!!!